Indiana Box Setting

This project’s purpose was to remedy an extremely difficult traffic situation. Utilizing pipe boring to maintain stream flow without disrupting traffic, Clearwater also built a drilled caisson shoring wall, alleviating the need for additional roadway excavation in a tight, high-speed traffic situation.

Translate »