PennDOT District 1-0, Saegertown S.R. 198 and 6 Bridge + Round-a-bout Construction

The Bridge over French Creek with a highly sensitive Mussel population was Value Engineered by Clearwater eliminating disturbance to this endangered wildlife while saving PennDOT and the Taxpayers hundreds of thousands of dollars and precious time in eliminating detours.  Clearwater utilized our specialty foundation experience by installing Micro-pile Foundations in addition to Soldier Beam and Pre-cast Concrete Lagging Retaining Walls. The bridge tied in to a large Round-a-bout at one end, which allowed traffic to flow smoothly at the formerly congested intersection.   

Translate »