R. J. CORMAN TRAIL RAIL BRIDGE

This project included the replacement of a deteriorated 3-span bridge with a new single span structure over the Ghost Town Bike Trail, which is the former RJ Corman RR Rail bed.


It involved advanced demolition techniques, as well as complex temporary support systems in order to safely and successfully complete the project.

Utilizing phased construction in a utility-congested, high-traffic urban area, Clearwater made accommodations for the safety of local foot traffic by constructing an overhead pedestrian bridge. Also, usage of the trail was not interrupted during construction, as Clearwater built safety tunnels under the bridge for protection of users.

PROJECT DETAILS

Client:
PennDOT
Location:
Cambria County, Pennsylvania
Contract Value:
$3.7 Million

GALLERY

1/1

CORPORATE HEADQUARTERS

1040 Perry Highway

Mercer, PA 16137

724.300.1656

CONNECT WITH

US ON SOCIAL

ABOUT US:

Clearwater Construction is Pennsylvania's top bridge and heavy/highway construction company. Related services include concrete work, geotechnical and foundation services. We are a PennDOT pre-qualified general contractor, with offices and jobs sites across the Commonwealth of Pennsylvania and an office in the State of Idaho.

  • Clearwater Construction, Inc. LinkedIn Page
  • Clearwater Construction Facebook Page
  • Clearwater Construction Instagram Page
  • Clearwater Construction, Inc. Twitter

Copyright © 2020. Clearwater Construction, Inc. All rights reserved.

Equal Employment Opportunity Employer

EEO Policy Statement        Crane Rental        Home