FROSTY HOLLOW ROAD BRIDGE REPLACEMENT

This project involved the superstructure replacement at Bucks County Bridge No. 15, Frosty Hollow Road over Mill Creek, Middletown Township.


This project was a complete superstructure replacement with concrete repairs to the substructure units. Clearwater installed new drainage, concrete curb and sidewalk along with new asphalt approach roadways on both sides of the new bridge.

The project was completed 2 months ahead of schedule.

PROJECT DETAILS

Client:
PennDOT
Location:
Bucks County, Pennsylvania
Contract Value:
$635,000

GALLERY

1/1

CORPORATE HEADQUARTERS

1040 Perry Highway

Mercer, PA 16137

724.300.1656

CONNECT WITH

US ON SOCIAL

ABOUT US:

Clearwater Construction is Pennsylvania's top bridge and heavy/highway construction company. Related services include concrete work, geotechnical and foundation services. We are a PennDOT pre-qualified general contractor, with offices and jobs sites across the Commonwealth of Pennsylvania and an office in the State of Idaho.

  • Clearwater Construction, Inc. LinkedIn Page
  • Clearwater Construction Facebook Page
  • Clearwater Construction Instagram Page
  • Clearwater Construction, Inc. Twitter

Copyright © 2020. Clearwater Construction, Inc. All rights reserved.

Equal Employment Opportunity Employer

EEO Policy Statement        Crane Rental        Home