HEAVY/HIGHWAY CONSTRUCTION

FOR PUBLIC + PRIVATE SECTORS

At Clearwater Construction we are proud to partner with local City, State, and Federal agencies as well as the private sector in providing exceptional construction services. Whether it is a small paving project, a complex geotechnical issue, or large bridge construction project - we have the knowledge and manpower to successfully meet your needs.

  • Image-empty-state.png

    TRANSFORM 66 SUPPORT OF EXCAVATION

    Clearwater Construction is performing a variety of services for the Transform 66 project which is slated to transform Northern Virginia’s Interstate 66 into a multimodal corridor.

  • Image-empty-state.png

    TRANSFORM 66 BRIDGES + RAMP CONSTRUCTION

    Clearwater Construction is performing a variety of services for the Transform 66 Outside the Beltway project which is slated to transform Northern Virginia’s Interstate 66 into a multimodal corridor.

  • Image-empty-state.png

    GEORGE B. FLEGAL DAM + RESERVOIR

    Serving as a subcontractor to the Kanawha Stone Company, Inc., Clearwater Construction is responsible for the construction of a spillway at the Cobun Creek Dam No. 1 and 2.

  • Image-empty-state.png

    INTERSTATE 84 BRIDGE RECONSTRUCTION

    This project includes the reconstruction of an existing 24-foot rural interstate roadway, eastbound and westbound in Pike County, PA.

  • Image-empty-state.png

    SOUTH LEATHERWOOD BRIDGE REPLACEMENT

    This project included the replacement of the existing structure carrying SR 861 over Leatherwood Creek with a two lane, single span Composite Prestressed Concrete Bulb-Tee Beam Bridge.

  • Image-empty-state.png

    TINICUM CREEK BRIDGE REHAB + AQUEDUCT

    This project included the removal of an existing steel girder bridge and replacing it with a prestressed concrete plan beam bridge with architectural surface treatment, and rock lining.

  • Image-empty-state.png

    SAEGERTOWN BRIDGE + ROUND-A-BOUT PROJECT

    The State Route 198 Bridge over French Creek, was Value Engineered by Clearwater eliminating wildlife disturbance while saving PennDOT and the Taxpayers hundreds of thousands of dollars and precious time in eliminating detours.

  • Image-empty-state.png

    BRANDYWINE CREEK BRIDGE

    This project included the replacement of Street Rd. Bridge over Brandywine Creek and replacement of an existing under-designed large diameter pipe with a double cell precast arch structure at Radley Run.

  • Image-empty-state.png

    PYMATUNING DAM REHABILITATION

    Clearwater was contracted by the PA DCNR to rehabilitate the dam and gatehouse at Pymatuning State Park. Pymatuning State Park is the largest state park in Pennsylvania, covering more than 21,000 acres in Crawford County.

  • Image-empty-state.png

    MON WHARF SWITCHBACK BRIDGE

    The Mon Wharf Switchback Ramp is a Riverlife project in partnership with the City of Pittsburgh to fill a vital missing link in downtown Pittsburgh’s riverfront park and trail system.

  • Image-empty-state.png

    FREEPORT ROAD BRIDGE REPLACEMENT

    This project is in a highly congested area between Sharpsburg and Aspinwall, PA with adjacent on and off ramps to the Highland Park Bridge over the Allegheny River.

  • Image-empty-state.png

    MONROE COUNTY BRIDGE REPLACEMENT

    This project, located on US Route-209 over Appenzell Creek in Stroudsburg, PA, involved a very high-speed traffic situation, where two merge zones of 2 lanes each merge into one 2-lane work zone.

  • Image-empty-state.png

    EWINGS MILL BRIDGE REPLACEMENT

    This project’s purpose was to remedy an extremely difficult traffic situation and included the replacement of the existing structure carrying US 422 over Laurel Run.

  • Image-empty-state.png

    EWINGS MILL BRIDGE [DRILLING]

    Utilizing pipe boring to maintain stream flow without disrupting traffic, Clearwater built a drilled caisson shoring wall, alleviating the need for additional roadway excavation in a tight, high-speed traffic situation.

  • Image-empty-state.png

    POCONO LAKE BRIDGE REPLACEMENT

    This project included the replacement of a decaying two-span bridge over Pocono Lake Preserve. Due to a NASCAR event at the Pocono Raceway, the Phase 1 completion date was of paramount importance.

  • Image-empty-state.png

    ROSEMONT AVENUE BRIDGE

    This project included the replacement of the Rosemont Ave. Bridge over Darby Creek with construction of a single span, composite pre-stressed concrete spread box beam bridge on spread footings.

  • Image-empty-state.png

    FROSTY HOLLOW ROAD BRIDGE REPLACEMENT

    This project involved the superstructure replacement at Bucks County Bridge No. 15, Frosty Hollow Road over Mill Creek, Middletown Township.

  • Image-empty-state.png

    GROVE CITY COLLEGE STREAM STABILIZATION

    This project included the stabilization of the Wolf Creek stream bank and bed for Grove City college in Grove City, PA.

  • Image-empty-state.png

    WESTVIEW WATER AUTH. | MICROPILE INSTALLATION

    This project was a Design Build redesign installation of 20 each seven- inch .408 wall micropiles 75 feet deep along the Monongahela River in very dense silty sand alluvial deposits with cobbles and boulders.

  • Image-empty-state.png

    GEORGE C. PLATT MEMORIAL BRIDGE

    Clearwater partnered with a painting contractor to perform this $52M rehabilitation of the George C. Platt Memorial Bridge for PennDOT from 2011 to 2014.

  • Image-empty-state.png

    SOIL NAIL RETAINING WALL INSTALLATION

    Clearwater Geotechnical acted as the specialty Geotechnical subcontractor for this emergency landslide remediation.

  • Image-empty-state.png

    R. J. CORMAN TRAIL RAIL BRIDGE

    This project included the replacement of a deteriorated 3-span bridge with a new single span structure over the Ghost Town Bike Trail, which is the former RJ Corman RR Rail bed.

  • Image-empty-state.png

    SCHUYLKILL RIVER BRIDGE REPLACEMENT

    The project included the replacement of the existing bridge carrying State Route 0895 over the Schuylkill River and re-alignment of the roadway approaches.

  • Image-empty-state.png

    COLD SPRINGS CREEK BRIDGE REPLACEMENT

    Clearwater was awarded this $3.4M contract for the removal and replacement of an existing structure over Cold Springs Creek in Whitehall Township by PennDOT.

  • Image-empty-state.png

    MILL STREET BRIDGE

    Clearwater was awarded the partial design/build contract for the replacement of the historic South Mill Street Bridge over Neshannock Creek in the city of New Castle.

  • Image-empty-state.png

    HICKORY STREET BRIDGE RESTORATION

    This $4M project was for the restoration of this historically significant, single-span steel thru-truss structure carrying Hickory Street over the Stonycreek River in the City of Johnstown.

  • Image-empty-state.png

    DOE RUN ROAD BRIDGE REPLACEMENT

    This project included the demolition of the existing bridge structure on Doe Run Road over County Line Run (Bridge No. 13-0067) in Denton Hill State Park in McKean County, PA for the DCNR.

projects_cover.jpg

PROJECTS

CORPORATE HEADQUARTERS

1040 Perry Highway

Mercer, PA 16137

724.300.1656

CONNECT WITH

US ON SOCIAL

ABOUT US:

Clearwater Construction is Pennsylvania's top bridge and heavy/highway construction company. Related services include concrete work, geotechnical and foundation services. We are a PennDOT pre-qualified general contractor, with offices and jobs sites across the Commonwealth of Pennsylvania and an office in the State of Idaho.

  • Clearwater Construction, Inc. LinkedIn Page
  • Clearwater Construction Facebook Page
  • Clearwater Construction Instagram Page
  • Clearwater Construction, Inc. Twitter
  • YouTube

Copyright © 2020. Clearwater Construction, Inc. All rights reserved.

Equal Employment Opportunity Employer

EEO Policy Statement        Crane Rental        Home