top of page

I-84 BRIDGE AND TUNNEL REPLACEMENTS

Clearwater Construction provided bridge demolition and reconstruction services along I-84 in Pike County, PA.

Clearwater Construction is subcontracted to James D. Morrissey, Inc. and is providing the demolition and full construction of multiple bridge structures on Interstate 84 in Pike County, PA. This work consists of two new 3-span PA bulb tee beam bridges and also includes the construction of a large cast-in-place vehicular tunnel under I-84 and all associated work including support of excavation, driven piles, temporary stream diversion and restoration.

PROJECT DETAILS

Client:
James D. Morrissey, Inc.
Location:
Pike County, PA
Contract Value:
$17 Million

GALLERY

CCI Logo 2026_white.png

CORPORATE HEADQUARTERS

1040 Perry Highway

Mercer, PA 16137

724.300.1656

​

​

CONNECT WITH

US ON SOCIAL

ABOUT US:

Clearwater Construction is Pennsylvania's top bridge and heavy/highway construction company. Related services include concrete work, geotechnical and foundation services. We are a PennDOT pre-qualified general contractor, with offices and jobs sites across the Commonwealth of Pennsylvania and along the East Cost.

  • Clearwater Construction, Inc. LinkedIn Page
  • Clearwater Construction Facebook Page
  • Clearwater Construction Instagram Page
  • YouTube

Copyright © 2026 Clearwater Construction, Inc. All rights reserved.

Equal Employment Opportunity Employer

EEO Policy Statement

bottom of page